Do More Training

DOMORE

Do More Training

Built for Coaching.Designed for Maximizing Space.

Custom school gyms engineered to maximize floor space — empowering teachers to actively coach every student simultaneously, in total safety.

Do More gym Lachine

Lachine Gym

Built toperform

Located at 1150 Bd Saint-Joseph, Lachine, QC H8S 2M7, synthetic turf, functional racks, rings, and a cardio mezzanine — a facility built for athletes who train with intent.

  • Synthetic turf & open functional floor
  • Power racks, rings & pro-grade equipment
  • Coaching led by David Lavoie & team
  • Demanding culture, supportive community

School Design

School Training Facilitiesturnkey

From first sketch to final install — training facilities built for how teachers actually teach and how students actually move.

Active culture

Spaces that encourage daily movement — strengthening health, pride, and the student-athlete community.

Belonging & cohesion

Branding, layout, and equipment that give students and staff a shared identity they recognize the moment they walk in.

Every inch, intentional

Movement-based zones, clear sightlines for supervision, and optional wall routines that support block teaching.

Presentation slide 1

1 of 10

David Lavoie

Founder & Head Strength Coach

David Lavoie leads every school project personally — 18 years turning libraries, aging gyms, and new builds into facilities Quebec institutions are proud to open.

School gym planning by Do More

Portfolio

Deliveredacross Quebec

Conversions, modernizations, and new construction — four reference projects that set the standard for school training facilities.

Collège Saint-Anne
Conversion · 2012

Collège Saint-Anne

Lachine, QC

The Collège Saint-Anne gym in Lachine was formerly a library, transformed in 2012 into a benchmark for private colleges — avant-garde concept, large synthetic turf surface, and a shift away from conventional machines.

  • Library → training facility conversion
  • Large synthetic turf zone
  • Functional concept, fewer conventional machines
  • Reference project for private colleges
École secondaire Dalbé-Viau
Modernization · 2015

École secondaire Dalbé-Viau

Lachine, QC

Completed in 2015, this modernization created a strong sense of belonging through integrated branding on walls and equipment. The layout is optimized for teachers — block-based sessions and active supervision.

  • Integrated branding (walls & equipment)
  • Strong sense of belonging
  • Layout built for active supervision
  • Block-based teaching workflow
École secondaire Jacques-Rousseau
Modernization · 2018

École secondaire Jacques-Rousseau

Quebec City, QC

Completed in 2018 with foundation funding. Full gym and branding modernization — synthetic turf surface with a clean, contemporary aesthetic.

  • School foundation funded
  • Gym + branding modernization
  • Synthetic turf surface
  • Clean contemporary style
École secondaire alternative Saint-Anne
New Build · 2022

École secondaire alternative Saint-Anne

Quebec

A brand-new 2022 build where the training facility was planned from day one. Designed around the best international trends in school athletic performance spaces.

  • New construction integrated into school
  • Planned from initial design phase
  • International best practices
  • Premium equipment specification

Next step

Let's planyour gym.

Maximize every square foot to unleash your teachers' full potential.